Cisco Headend System Release 2.5 Installation Guide

Page of 280
I-26 
SR 2.5/3.5 Direct ASI Installation and Configuration Procedures 
78-738190-01 Rev B 
Stop the BFS and OSM Processes 
Stopping the BFS and OSM Processes 
After setting the BIG offline, you need to stop the BFS and OSM processes on the 
DNCS next. Follow these instructions to stop the processes. 
 
  1. 
If necessary, open an xterm window on the DNCS. 
  2. 
Type dncsControl and then press Enter
Result:  The Dncs Control window opens.