Cisco Headend System Release 2.5 Installation Guide

Page of 280
78-738190-01 Rev B 
SR 2.5/3.5 Direct ASI Installation and Configuration Procedures 
I-29 
Tear Down BFS Sessions 
Tearing Down BFS Sessions 
After stopping the BFS and OSM processes, tear down the BFS sessions. Follow these 
instructions to tear down the BFS sessions. 
 
  1.  From the DNCS Administrative Console, select the Utilities tab. 
  2.  Click Session List
Result:  The Sessions window opens. 
 
  3.  Highlight the BFS sessions and then click Teardown Selected Sessions
Result:  A confirmation message appears. 
  4.  Click OK
Result:  The system tears down the BFS sessions. 
  5.  Go to Clear Completed, Pending, or Failed Sessions, next in this appendix.