Cisco Headend System Release 2.5 Release Notes

Page of 168
 
Appendix D 
Direct ASI Rollback Procedures 
140 
4004148 Rev C 
Turn on the BIG 
Verify Power-up Sequence 
Turn on the BIG and verify that the BIG goes through a power-up sequence. Various 
lights should illuminate. After about a minute, the BIG should settle into a steady 
state.