Cisco Headend System Release 2.5 Release Notes

Page of 168
 
 
Final System Validation Tests 
4004148 Rev C 
81 
 
Final System Validation Tests 
Verifying a Successful Installation 
1  Complete the following steps to perform a slow boot and a fast boot on a DHCT 
with a working return path (2-way mode). 
a  Boot a DHCT. 
Note:  Do not press the Power button. 
b  Access the Power On Self Test and Boot Status diagnostic screen on the 
DHCT and verify that all parameters, except UNcfg, display Ready.  
Note:  UNcfg displays Broadcast. 
c  Wait 5 minutes. 
d  Press the power button on the DHCT. Power to the DHCT is turned on. 
e  Access the Power On Self Test and Boot Status diagnostic screen on the 
DHCT. 
f  Do all of the parameters, including UNcfg, display Ready
– 
If yes, go to step 2. 
– 
If no, contact Cisco Services. 
2  Ping a test DHCT. 
3  Did the DHCT receive the ping? 
 
If yes, go to step 4. 
 
If no, call Cisco Services. 
4  Stage at least one new DHCT to the system operator’s specifications.  
5  After staging, did the DHCT successfully load the current client release 
software? 
 
If yes, go to step 6. 
 
If no, call Cisco Services for assistance. 
6  Did the DHCT receive at least 33 EMMs (Entitlement Management Messages) 
and successfully receive its Entitlement Agent? 
 
If yes, go to step 7. 
 
If no, call Cisco Services for assistance. 
7  Does the IPG display 7 days of valid and accurate data? 
 
If yes, go to step 8. 
 
If no, call Cisco Services for assistance.