Strand Mounting the Node 
OL-29643-02 
77 
 
Strand Mounting the Node 
Description 
The following procedure explains how to install the GS7000 Node on a strand (aerial 
installation). Strand mounting allows street-side access to the housing. 
 
Procedure 
Follow this procedure to mount the housing to a strand. The housing does not need 
to be opened for strand installation. 
 
    WARNING: 
Be aware of the size and weight of the node while strand mounting. 
Ensure that the strand can safely support the node’s maximum weight. 
A fully loaded GS7000 Node weighs over 50 lbs (22.7 kg). 
Ensure the ground area below the installation site is clear of personnel 
before hoisting the node. If possible, block off walkway below the 
hoisting area to prevent pedestrian traffic during hoisting. 
Failure to observe these admonishments can result in serious injury or 
death.
 
 
1  Check the strand size. The minimum strand diameter should be 5/16 inch. 
2  Attach the strand clamp brackets to the housing in the position shown in the 
following illustration. Use a torque wrench tightens the strand clamp bracket 
bolts from 5 ft-lb to 8 ft-lbs (6.8 to 10.8 Nm). 
 
 
3  Loosen the strand clamp bolts to separate the clamps enough to insert the strand,