Chapter 4    Setup and Operation 
 
 
 
62 
 
Forward Path Setup Procedure 
Introduction 
This procedure describes how to perform the forward path setup. 
Note: The procedure uses an example with a transmitter modulation index of 2.5% 
per channel and the 1.2GHz node with RF output level of 54 dBmV @ 1218 MHz. 
 
Setup Procedure 
Perform the following steps to set up the forward path. 
1  Ensure all unused RF ports are terminated with 75 ohms. Use an AC load if AC 
is routed to the RF port. 
2  Open the housing according to Opening and Closing the Housing (on page 68). 
3  Carefully disconnect the forward path optical fiber(s), if connected. 
 
    WARNING: 
Laser hazard. This product contains a class 3B laser with no safety interlocks. 
Under no circumstances should connectors be viewed with equipment 
enabled. Direct viewing of connectors can cause eye damage. Failure to adhere 
to this admonishment may result in serious injury to the eye(s) or even 
blindness.
 
 
 
CAUTION: 
Disconnecting the optical fibers of a working network element will interrupt 
customer service.
 
 
Note: Ensure all optical connectors are clean. See Care and Cleaning of Optical 
Connectors
 (on page 79). 
4  Use an optical power meter to measure the level of the input light signal from the 
forward path optical fiber cable(s). Signal should be 0 dBm, 1mW nominal, for a 
standard receiver; record the measurement(s). 
5  Connect the forward path optical fiber(s) to the receiver. Use a DVM to measure 
DC voltage at receiver optical power level test point. Scale: 1V DC = 1mW (1310 
nm transmitter) and 1.12 V DC = 1mW (1550 nm transmitter).