Cisco Model GS7000 4-Port Node 1 GHz with 42 54 Split Installation Guide

Page of 15
 
 
 
 
 
1.2 GHz GS7000 Node RF Split 
Upgrade Application Note 
 
Overview 
Introduction 
Cable operators have experienced an exponential rise in the requirement for more 
reverse path bandwidth due to the popularity of advanced, on-demand subscriber 
services. These operators need an upgrade path for previously deployed HFC 
equipment to  overcome this operational challenge. 
 
Purpose 
This application note describes the RF split upgrade procedure for 1.2 GHz 
GS7000  Nodes. 
Note: 
 
 
You will note that the final instruction in the split change process calls for the 
verification of forward and reverse signal for each port. This optional 
verification is included to ensure that all component replacements with respect 
to the split upgrade were performed correctly and to ensure that all 
replacement components perform as specified.  
 
While our products and the components included in the split upgrade kit are 
designed to perform well without this verification, we suggest this extra step 
to ensure that products meet customer expectations immediately upon 
placement into service.  
Should you need assistance with your upgrade, contact Cisco Services for 
support. 
 
 
WARNING: 
Avoid electric shock. Opening or removing this equipment cover may expose
you to dangerous voltages. RF split upgrades should only be conducted on
amplifiers that have been removed from the cable system, not on amplifiers
actively in service.