Cisco Model GS7000 4-Port Node 1 GHz with 42 54 Split Installation Guide

Page of 72
 
 
Status Monitor Configuration Procedure 
4022871 Rev C 
29 
 
9  On the toolbar, click the Save to Database button. 
10  On the toolbar, click the Download Config to Resource button. 
Note:  This step could take about a minute or two depending on the total number 
of devices that are currently deployed and being monitored. 
Result:  When completed a detailed description is displayed in the Activity Log 
window. 
11  Close the Configuration Wizard and return to the CheetahNet System Manager. 
12  On the System Manager menu bar, select Request - Load Network Elements - 
All Newly Added Devices
Result:  The new device should now display in the System Manager tree view 
under the associated HEC RF modem. 
 
Verifying Status Monitor Configuration Locally 
In the event that communications with the SM/LCM in CheetahNet is not successful 
it is recommended that the specific communication parameters be verified via a local 
connection to the device.  The following equipment is required: 
  
The Test2Way™ for Scientific Atlanta GS7000 Seg2Way SM/LCM application 
  
A Scientific Atlanta local interface cable (part number 1004044) 
  
A Windows-based laptop computer with a DB-9 serial port connector 
Note:  If the device has already been added to the CheetahNet system you should 
place the device in maintenance mode (polling off) before connecting to it locally. 
Connect as shown in the following illustration and start the Test2Way for Scientific 
Atlanta GS7000 Seg2Way SM/LCM application.