Cisco Headend System Release 2.5 Technical References
78-4020566-01 Rev B
5
Optimize Your Staging Time
Optimize Your Staging Time
To optimize the staging time for new SSC host DHCTs, Cisco recommends the
following network changes. These changes provide your staging area with improved
efficiency in the staging process:
Cisco has created patches to address customer concerns about staging time for
the SSC DHCTs. The patches deliver the CVT message to the out-of-band
carousel once every 30 seconds. This results in the overall staging time being
reduced by an average 4-5 minutes per DHCT. To take advantage of this
enhancement, your DNCS needs to be upgraded to one of the following releases:
-
SR 2.5/3.5/4.0 Service Pack 3 (Emergency Patch 3)
-
SR 2.7/3.7/4.2 Service Pack 0.2 (Emergency Patch 1)
Note: A patch for SR 2.2/3.2 Service Pack 5 was not developed for this
enhancement.
Changing the data carousel rate to 3 Mbps improves the update time of the BFS
carousel and reduces the time it takes for the software download to complete.
Note: The ability to change the data carousel rate to 3 Mbps is dependent on
Note: The ability to change the data carousel rate to 3 Mbps is dependent on
available bandwidth in the network.
Using the listCVT utility identifies unused files on the image list that can then be
deleted. Removing these unnecessary files from your BFS carousel optimizes the
bootloader carousels to include only the necessary CVT files. The following
procedure provides instructions to run the utility and remove the files.