Cisco Headend System Release 2.7 Installation Guide

Page of 32
 
 
740223 Rev F 
 
Introduction 
The Session-Based Encryption (SBE) activation process involves five 
phases that span seventeen days.  
On Day One, Cisco Services engineers perform the SBE activation 
phase tasks. The four additional SBE set-up phases include procedures 
you perform on Days Two, Five, Ten, and Seventeen. The length of 
time between each phase lets you measure the system database 
progress to ensure that type 8 EMMs are being generated. 
Note: The actual amount of time needed to complete each process 
within a phase will vary depending on the size of the site and the 
complexity of the system. 
This chapter details the procedures that must be completed to activate 
SBE on your system. 
Before You Begin 
On the last day (seventeen), you must use the VOD Information 
diagnostic screen to verify that a DHCT has received type 8 EMMs. 
This step cannot be performed on DHCTs that do not support the  
SA Resident Application (SARA).  
Important: If your DHCTs are supported by a resident application 
other than SARA, contact your vendor to see if there is a similar 
verification procedure to determine that the DHCTs have received 
type 8 EMMs. 
 
Chapter 2 
Activate SBE