Cisco Headend System Release 2.7 Installation Guide

Page of 32
 
Chapter 2    Activate SBE 
 
 
 
12 
740223 Rev F 
 
Task 9: De-provision all OOS and in-service DHCTs 
Staging should be suspended while we reset the configuration of all out-of-service 
(OOS) and in-service DHCTs that do not have any packages. This process may range 
from 15 minutes to over an hour, depending on the size of your site and the 
complexity of your system. 
Note: Resetting the configuration of a DHCT is sometimes referred to as de-
provisioning the DHCT. 
 
Overview of Day One Tasks 
Cisco Services engineers will perform the following tasks to activate SBE on your 
system. 
1  Verify that your DNCS is licensed for session encryption, and activate the 
license, if necessary.  
Important: Before licensing is complete, Cisco Services engineers must bounce 
the DNCS before this change will take effect. 
2  Install the SBEutils.tar file on the DNCS, and then verify that the deletesm utility 
is version 2.0 or later. 
3  Verify standard EMM expiration and creation information using the smMix 
process. 
4  Run a Doctor Report to verify that enough database space is available for 
additional type 8 EMMs. 
5  Set the CAM_DIS_STAGING_CUTOFF_DATE to 20 days in the future, and tell 
the customer when the CAM_DIS_STAGING_CUTOFF_DATE will expire. 
6  Source the variable and bounce the camAm and camAuditor processes.  
Note: DHCTs will not receive billing hits while the camAm and camAuditor 
processes are down. Billing hits will resume after the processes have recovered. 
Services will not be affected during this task. 
7  Verify that the DIS enable flag is being transmitted to DHCTs by the billing 
system.  
Important: System DHCTs must receive the DIS enable flag on each transaction 
from the billing system in order for SBE to be activated. 
8  Manually set DIS enable on all DHCTs in the DNCS database. 
9  De-provision all OOS and in-service DHCTs that do not have any packages. 
These DHCTs will be restaged when they are provisioned, or prepared, with 
packages.  
Important: Staging should be suspended while this step is being completed. 
10  Confirm that type 8 EMMs are being created.