Cisco Headend System Release 2.7 Installation Guide

Page of 54
 
Chapter 2    Upgrading the Software 
 
 
 
16 
4022900 Rev C 
Upgrade Process Overview 
Before You Begin 
Before you upgrade to GQAM software version 4.2.1, be sure that your system meets 
the criteria specified in System Release Compatibility and Prerequisites (on page 7) 
and Application Platform Release Dependencies (on page 8). 
If you will not be downloading the GQAM software from our File Transfer Protocol 
(FTP) site, make sure that you have obtained the CD, GQAM V4.2.1, part number 
4021954. 
 
Time to Complete 
When upgrading GQAMs with the new software, consider the following tasks and 
the amount of time required for each: 
 
Completing pre-upgrade tasks takes from 30 to 45 minutes. 
 
If you are upgrading from an FTP site, allow an additional 10 to 15 minutes to 
download the software from the FTP site. The speed of the connection and the 
size of the files will determine the actual download time. 
 
Downloading new software to the GQAM takes approximately 8 minutes for 
each modulator. 
 
For GQAMs that carry broadcast sessions, the DNCS will restart the sessions 
after the GQAMs load new software. 
 
For GQAMs that carry VOD sessions, only those sessions that are determined to 
be active will be restarted. Because subscribers may tune away when the GQAM 
reboots, the total number of recovered sessions may not match the original 
number of sessions on the GQAMs. 
Note: It is not necessary to rebuild non-VOD sessions on the GQAMs that you 
upgrade. The non-VOD sessions are rebuilt automatically after the new software is 
downloaded to the GQAM. 
 
Subscriber Impact 
When GQAMs are reset (rebooted) during the upgrade, the services they carry are 
interrupted. DHCTs will show a frozen picture or black screen until the upgrade is 
complete and the DNCS has restarted all of the active sessions on the GQAM.