Cisco Prisma II bdr Dig Rev 2 1 Dual Mux Sys for High Density Installations Installation Guide

Page of 76
78-741939-01 Rev C 
Installing the Enhanced Digital Reverse Modules in the Node 
 
2-9 
2. 
Pull the aluminum frame slightly away from one side of the optical section 
and slip each tab out of the hole. Repeat procedure for the other side. 
3. 
Swing the tray out from the optical section and the other two tabs rotate in 
their slots allowing easy access to the tray. 
Note:  This illustration and others show the double-wide laser module only. 
The single-wide module is similar except for size. The instructions are the 
same for both. 
 
Result:  The fiber management tray is open and the enhanced digital reverse 
modules are ready to be installed in the optical section (housing lid) of the 
node. 
Opening the Plastic Cover of the Fiber Management Tray 
Follow these steps to open the plastic cover of the fiber management tray. 
 
1. 
Pull out the plunger fasteners that keep the plastic cover of the fiber 
management tray in place. 
2. 
Open the clear plastic cover.