Cisco Prisma II bdr Dig Rev 2 1 Dual Mux Sys for High Density Installations 설치 가이드
78-741939-01 Rev C
Installing the Enhanced Digital Reverse Modules in the Node
2-9
2.
Pull the aluminum frame slightly away from one side of the optical section
and slip each tab out of the hole. Repeat procedure for the other side.
3.
Swing the tray out from the optical section and the other two tabs rotate in
their slots allowing easy access to the tray.
Note: This illustration and others show the double-wide laser module only.
Note: This illustration and others show the double-wide laser module only.
The single-wide module is similar except for size. The instructions are the
same for both.
Result: The fiber management tray is open and the enhanced digital reverse
modules are ready to be installed in the optical section (housing lid) of the
node.
Opening the Plastic Cover of the Fiber Management Tray
Follow these steps to open the plastic cover of the fiber management tray.
1.
Pull out the plunger fasteners that keep the plastic cover of the fiber
management tray in place.
2.
Open the clear plastic cover.