Cisco Model D-PCG1000 PowerKEY CAS Gateway Installation Guide

Page of 66
 
Chapter 4    Initializing the TED FX Server 
 
 
 
24 
736138 Rev F 
Re-Initialize the PowerKEY CA System 
Introduction 
Re-initializing the PowerKEY CA system involves uploading the PowerKEY CAA 
keys and the existing Entitlement Agent (EA) pass phrase onto the DNCS/ISDS and 
the TED FX server. This section provides instructions to re-initialize the PowerKey 
CA system. 
Only re-initialize the PowerKEY CA system if you are completing the following 
tasks: 
 
Replacing an existing TED FX server 
 
Re-initializing a previous initialized DNCS/ISDS  
 
Initializing a back-up TED FX server 
Important: If the DNCS/ISDS has never been initialized, you must initialize the 
DNCS/ISDS to apply the PowerKEY CAA keys, the Entitlement Agent (EA) pass 
phrase, and the Factory Root Certificate Authorization Key. See Initialize the 
PowerKEY CA System (on page 20) for further instructions. 
 
Before You Begin 
To ensure the security of your system, an SA installer must be present when you are 
ready to complete the instructions in this section. Only SA installers know the other 
portion of the CAA Pass Phrase that is necessary to complete the instructions. 
Important: 
 
All UNIX commands are case sensitive. 
 
For more information on the pass phrases and on safeguarding your pass 
phrases, see Safeguarding Pass Phrases (on page 37). 
 
Re-Initializing the PowerKEY CA System 
Complete these steps to re-initialize the PowerKey CAA Keys and the EA Pass 
Phrase on the DNCS/ISDS and the TED FX server. 
Note: All UNIX commands are case sensitive. 
1  Open an xterm window on the DNCS/ISDS and log on as the dncs user. 
2  Type export  EMCDEBUG= and press Enter
3  Type export  EMCERROR= and press Enter