Cisco Model D-PCG1000 PowerKEY CAS Gateway Installation Guide

Page of 66
 
Chapter 5    Supporting the TED FX Server 
 
 
 
32 
736138 Rev F 
Standard Instructions 
Introduction 
You must follow the standard instructions to successfully power down, power up, or 
reboot the TED FX server. This section provides instructions for powering down, 
powering up, and rebooting the TED FX server. 
 
Powering Down the TED FX Server 
Complete these steps to properly power down the TED FX server. 
Note: All UNIX commands are case-sensitive. 
1  Open an xterm window on the DNCS/ISDS. 
2  Type su and press Enter. The password prompt appears. 
3  Type your password and press Enter
Note: If you do not know your password, contact your network system 
administrator for assistance. 
4  Type rsh  dncsted  shutdown  –h  now and press Enter
5  Wait 60 seconds before proceeding to the next step. 
6  Press the Power button on the front panel of the TED FX server to turn the power 
off. 
7  If you would like to power up the TED FX server, wait 60 seconds, and then go 
to Powering Up the TED FX Server (on page 32). 
 
Powering Up the TED FX Server 
When the TED FX server has been powered down, complete these steps to properly 
power up the TED FX server. 
Note: All UNIX commands are case sensitive. 
1  Press the power button on the front panel of the TED FX server to turn the power 
on, and wait 60 seconds before proceeding to the next step. 
2  From an xterm window on the DNCS/ISDS, type ping  dncsted and press Enter
3  Did the message dncsted is alive appear? 
 
If yes, you have successfully powered up the TED FX server. 
 
If no, complete steps 4 through 6. 
4  Verify that the power cord is tightly inserted into the power receptacle on the 
back panel of the TED FX server and into a 120 V AC power source.