Cisco Headend System Release 2.7 Maintenance Manual

Page of 202
 
Chapter 2    Optimize Your System Performance for Downloads and Staging 
 
 
 
74 
4024836 Rev D 
Test the Updated OOB CVT Message Cycle Time 
We highly recommend that you test the change to your OOB CVT message cycle 
time to ensure optimum performance. Complete the following procedure to test the 
updated OOB CVT message cycle time. 
1  Force a group of SSC DHCTs to download code (restage the SSC DHCTs - both 
the host and the CableCARD module).  
Notes: 
 
Make sure that you are downloading the correct code for the SSC DHCT 
models you are staging. 
 
Follow your site's procedures to force the download, or see Downloading New 
Client Application Platform Installation Instructions (part number 4003052) for 
instructions on how to force an SSC DHCT to download code. 
2  Did the SSC DHCTs download the code correctly? 
 
If yes, you are finished with this procedure. 
 
If no, follow these steps: 
– 
Verify that you have the correct code version available for the SSC 
DHCTs. 
– 
Verify that you are using the correct OOB CVT message cycle time. 
Follow the procedure in Calculating the Optimum OOB CVT Message 
Cycle Time (on page 71) again. 
– 
Contact Cisco Services.