Site Requirements 
 
Process 
Length of Time 
Activity 
Upgrade 
6-8 hours total; 
2-3 of these hours 
require system 
outage 
Note: Actual time 
may vary based 
on the number of 
devices being 
upgraded. 
Upgrade the DBDS network: 
 
Back up the DNCS database 
 
Install the DNCS and Application Server 
software 
 
Determine which optional features (licensed or 
unlicensed) need to be enabled as a result of this 
upgrade 
 
Install and download the component software 
(QAM, MQAM, GENERIC QAM, and QPSK 
modulator) 
 
Reboot the hardware 
 
Complete functional checks 
QPSK modulator upgrades and some QAM and 
MQAM upgrades can be completed with little or no 
subscriber impact. However, 2-3 hours of the 
upgrade require system outage. 
Post-Upgrade 
3-4 hours 
Back up the system: 
 
Back up the file system 
 
Back up the DNCS database 
These activities do not impact the system.