Cisco Headend System Release 2.7 Troubleshooting Guide

Page of 92
 
 
4024428 Rev B 
39 
 
Introduction 
This chapter details the steps you need to follow to configure EAS 
events, messages, and tests. Included are the Required Weekly Test 
(RWT) and Required Monthly Test (RMT). 
 
 
 
Chapter 5 
Configure EAS Events, 
Messages, and Tests 
In This Chapter 
 
 
