Monitoring Production
Schedules in CWA
Schedules Pane Interface
These topics describe the Schedules Pane interface:
Accessing the CWA Schedules
From the Navigator pane, select Operations>Schedules
 to display the Schedules pane. 
You can change the sort order of the display by clicking the head of the column that you want to use as a sort key. 
Buttons 
 Print —Displays the Reports window to view and print the contents of the Schedules pane. For more information about 
the Schedules pane report, see 
Search Field
Enter text that you want to search for within the columns displayed into this field.
Note: This field at the top right of the grids will only search text columns that are not grayed out and are string-based. 
See 
Columns
Date —The date of the compile.
Compile Start —When the compile began.
Compile End —When the compile finished.
Duration —The overall length of time of the compile.
Sched Jobs —The number of scheduled jobs.
Adhoc Jobs —The number of unscheduled jobs.
Reruns —The number of jobs that were rerun jobs (not original instances).
Carry-Over —The number of jobs that were carried forward from a previous schedule.
Compile Type —The compile type of schedule. If a scheduled compile, the schedule will run as soon as the 
production day starts. If a forecast compile, the schedule is recompiled at the start of the production day before the 
schedule runs.