Cisco Model D9479 Gigabit QAM Modulator Installation Guide

Page of 134
 
Chapter 2    Installing the Dual SFP GQAM 
 
 
 
22 
78-745431-01 Rev E 
Install the Modulator Into a Rack 
The front bezel of the GQAM mounts to the front of the equipment rack. The GQAM 
fits into an EIA RS-310 rack mount. 
Important: You must read the preceding section, 
Stacking Guidelines (on page 18), 
before installing the modulators into the rack. 
 
Installation Requirements 
Installation Requirements 
This section lists the power, rack, and environmental conditions necessary for 
installation. 
 
Power Requirements Table 
 
Item 
Specification 
Supply Voltage 
 
90 to 130 VAC @ 47 to 63 Hz (AC unit) 
 
180 to 264 VAC @ 47 to 63 Hz (AC unit) 
 
-42 to -57 VDC (DC unit) 
Fuses 
 
4.0 A SLO BLO 250 V (AC unit) 
 
6.3 A SLO BLO 250 V (DC unit) 
Line Frequency 
 
47 to 63 Hz (AC unit only) 
Power Required 
155 VA (typical) 
Power Dissipated 
151 Watts (typical) 
In Rush Current 
 
35 amps maximum, Vin = 130 VAC (AC unit) 
 
75 amps maximum, Vin = 264 VAC (AC unit) 
 
15 amps maximum, Vin = -57 VDC (DC unit) 
 
 
Rack Requirements Table 
 
Item 
Specification 
Rack Mount Type  EIA RS-310 
Height 
1.75 in./44.45 mm 
Width 
19 in./482.6 mm 
Depth 
22.5 in./571.5 mm 
Weight 
13.5 lb./5.4 kg