Cisco Cisco Prisma II EDR Receiver Installation Guide

Page of 47
78-715189-01 Rev C 
Operation 
3-7 
Checking the Operating Settings 
Preparing to Record Operating Data 
To ensure that the amplifier is operating properly, it is recommended to periodically 
monitor and record operating data. Having a record of operating data also 
establishes a baseline of unit performance for use in maintenance and 
troubleshooting.  
Before you begin, gather the equipment and tools listed in the following table: 
 
You Need . . .  
To . . . 
a Maintenance Log 
record new data and compare it against 
data recorded earlier. 
a spectrum analyzer 
verify proper HEDA operation. 
a 75 ohm coax cable with an F-
connector 
 
connect to the spectrum analyzer to the 
amplifier test point. 
1/8-in. flat-blade screwdriver 
adjust the PAD and TILT settings, as 
needed. 
 
Check the RF Input 
Complete the following steps to verify that the input level is within ±1.0 dB of the 
value most recently recorded. 
1. 
Connect an RF cable from the -20 dB RF TEST point on the front of the 
amplifier to the spectrum analyzer. 
2. 
Set the spectrum analyzer for the frequency span of your band of operation. 
3. 
Measure the signal level of the RF input test point. 
4. 
Check that the input level to the amplifier is within ±1.0 dB of the proper 
value. Remember to add 20 dB back to the measured RF TEST level to get the 
correct reading. 
Note: If the reading is not within the proper range, refer to Chapter 4 for 
assistance in troubleshooting. 
5. 
To complete weekly maintenance, go to the next procedure, Checking RF 
Output