Cisco Cisco IP Contact Center Release 4.6.2 Technical References

Page of 66
 
 
 
Changes to Support Post-Routing 
25 
 
 
25 
25 
SEND DATA 
      LINK # >12 SUBTYPE       ARRSALES VAR LIST A-E     
 
 
 
 
ON ERROR, EXECUTE STEP #   3 
Figure 17: Adjunct Route Request Example 
2.5.4.  Example CCT for Two-Step RC Dialog 
Figure 18 illustrates the steps required to invoke a post-route request using RTE 
with dialed number from DNIS. 
CONTENTS OF VARIABLE [#] TO VARIABLE [D] 
SEND DATA 
      LINK # >12 SUBTYPE        RTE37 VAR LIST A-E     
 
 
                             ON ERROR, EXECUTE STEP #   5 
RECEIVE DATA      LINK # >12 ON NAK, EXECUTE STEP 6 
 
 
 
 
ON ERROR, EXECUTE STEP 7 
CALL CONTROL TABLE   CCT 12  
// CCT to handle timeouts 
CALL CONTROL TABLE   CCT 13  
// CCT SEND DATA ERROR. 
CALL CONTROL TABLE   CCT 14  
// CCT to handle NAKs 
CALL CONTROL TABLE   CCT 15  
// CCT to handle ERRORs 
Figure 18: CCT for Two-Step RC Dialog
—RTE, Dialed Number 
from DNIS 
Figure 19 represents the above CCT (Figure 18) in the Aspect 7 Architect 
Program: 
 
Figure 19: CCT for Two-Step RC Dialog
—RTE, Dialed Number from DNIS 
(Aspect Architect Version) 
Figure 20 illustrates the steps required to invoke a post-route request using XFE 
with dialed number XFRTOSALES from SUBTYPE.