Cisco Cisco IPCC Web Option Installation Guide

Page of 180
CallRouter Upgrade Procedures
CallRouter Pre-upgrade Preparation
Pre-upgrade preparation is an integral part of the upgrade process. Perform the following on
the CallRouter to assist in recovery in the event of a catastrophic upgrade failure:
Step 1
Copy the Cisco registry key.
Step 2
Copy the ICM/bin directory.
CallRouter Technology Refresh Upgrade: Side A/B
Note: The following procedure is used to perform a Technology Refresh upgrade on both sides
of the Logger. When upgrading Side A use the procedure as is. When upgrading Side B, simply
replace “Side A” with “Side B” in the procedure.
Step 1
Export the ICM router registry from the production CallRouter, and import the registry to the
new CallRouter.
Step 2
Run ICM setup.exe from the ICM/IPCC 7.0(0) CD on the new CallRouter. Choose to apply the
automated hardening when prompted.
Step 3
From ICM setup, edit the instance and insert the new domain name on the new CallRouter.
Step 4
From ICM setup, edit the CallRouter component and make the necessary changes based on the
environment in which the new CallRouter is to be run.
Step 5
Using ICM Service Control, set all ICM processes on the new CallRouter to Manual Start.
Upgrade Guide Cisco ICM/IPCC Enterprise & Hosted Editions Release 7.0(0)
91
 Chapter 10