Cisco Cisco IP Contact Center Release 4.6.2 Release Note

Page of 107
 
Hosted NAM/CICM Model 
 
Step 70. 
Start AW (Distributor) Services 
Verify that the ICM Processes have no errors: 
CallRouters: 
Router: running and synchronized with peer 
Ccagent: connected to all configured peripheral gateways 
Rtsvr: feed activated to AW 
Loggers: 
Logger: connected to its respective database and synchronized with peer. The MDS is in 
service 
Replication: connected to AW 
CampaignManager: process up on logger and connected to the Blended Agent Dialer 
Admin Workstation: 
Updateaw: displays “waiting for new work” 
Iseman: listen thread waiting for client connection 
Replication: replication and recovery client connection initialized 
Cms_jserver: cmsnode.exe process is active. The event helper message shows CCS and 
CEM are running 
Cmsnode: initialization complete 
Peripheral Gateways: 
Generic (IPCC & VRU) PG 
  Mdsproc: in service 
  Pgagent: in service and active to one side of central controller 
  [peripheral] PIMs: disabled on node form. PIM windows do not exist 
MR PG 
  Mdsproc: in service 
  Pgagent: in service and active to one side of central controller 
  [peripheral] PIMs: enabled in setup. The Blended Agent PIM is now ACTIVE. 
E-Mail Manager PIM is now ACTIVE and Media Blender PIM is ACTIVE 
CTI Server: 
Cg[#]ctisvr: active with configured port number 
CTIOS Server: 
Ctios Server: active with configured port number. The driver is online 
Ctidriver: active 
Blended Agent Dialer: 
Blended Agent Dialer: EMT connection established and configuration received 
E-Mail Manager Core: 
Rules engine process: inbasket authenticated 
Collaboration Server: 
Admin UI: under Collaboration Server > Server Setup > Connections\Monitor – all 
services have an UP status. 
Media Blender: 
Admin UI: under Media Blender > Server > Startup Shutdown. Media Blender has been 
running for <time>. 
Admin UI: under Media Blender > Services > Firewall Gateway > Monitor. All gateway 
stubs have a RUN status. 
Final NAM/CICM Staging Tasks 
Step No. 
Task 
71.  
Change Domain Controllers to Native Mode 
72.  
Install Listeners, LG Mappers and LGArchiver 
73.  
Complete Staging Tests 
74.  
Complete Settings for Production Environment 
75.  
Complete Staging Issues Record 
Release 6.0(0) Staging on Windows 2000 
101