Alcatel-Lucent omniaccess 6000 User Manual
Installing the Chassis
11
Chapter 2
N
OTE
—Some cabinets require different screws which are not included. Verify
that you use the correct screws or fasteners for your rack system.
Adding Modules
If you have received your modules separately from the chassis, or wish to
expand the system with additional modules, see Part 2 of this manual for
specific instructions on installing each module.
expand the system with additional modules, see Part 2 of this manual for
specific instructions on installing each module.
N
OTE
—By adding modules, you are increasing the switch’s total power load.
Depending on the modules installed, you may be required to add power sup-
plies to the switch and/or increase the capacity of your site’s electrical sys-
tems. For details, see
plies to the switch and/or increase the capacity of your site’s electrical sys-
tems. For details, see
Connecting Power
Verify you understand the procedure and all precautions.
Before beginning, read the entire procedure. Verify you understand all the
precautions in these steps as well as those on
precautions in these steps as well as those on
Verify that the installed power supplies can handle the switch’s
power load.
power load.
The number of power supplies required for your Alcatel Wireless LAN Switch
depends on the number and type of modules installed. See
depends on the number and type of modules installed. See
for details.
Verify that your site’s electrical systems can handle the switch’s
power load.
power load.
z
Each standard power supply (OWA-6000-PS200) is rated at 200 W total
and is auto-ranging to accept 90-132/ 170-264 VAC, at 50 to 60 Hz.
and is auto-ranging to accept 90-132/ 170-264 VAC, at 50 to 60 Hz.
z
Each optional power supply (OWA-6000-PS400) is rated at 400 W total
and is auto-ranging to accept 85 to 264 VAC, at 50 to 60 Hz.
and is auto-ranging to accept 85 to 264 VAC, at 50 to 60 Hz.
Depending on the switch’s total power load, you may be required to increase
the capacity of your site’s electrical systems. See
the capacity of your site’s electrical systems. See
for details.
C
AUTION
—This procedure should be performed by a trained technician.
1
2
3