HP 2520g-poe User Manual

Page of 101
2-4
Installing the Switch
Installation Procedures
Installation Procedures
These steps summarize your switch installation. The rest of this chapter 
provides details on these steps.
1.
Prepare the installation site (
).
 Make sure the physical 
environment into which you will be installing the switch is properly 
prepared, including having the correct network cabling ready to connect 
to the switch and having an appropriate location for the switch. See 
 
for some installation precautions.
2.
Verify the switch passes self test (
).
 Plug the switch into a 
power source and observe that the LEDs on the switch’s front panel 
indicate correct switch operation. 
3.
Mount the switch (
 The 2520G-PoE switches can be mounted 
in a 19-inch telco rack, in an equipment cabinet, on a wall, or on a 
horizontal surface. 
4.
Connect power to the switch (
).
 Once the switch is mounted, 
plug it into the main power source.
5.
Connect the network devices (
).
 Using the appropriate 
network cables, connect the network devices to the switch ports.
6.
(Optional) Install mini-GBICs (
 The switch has two or four 
slots for installing mini-GBICs. Depending on where you install the switch, 
it may be easier to install the mini-GBICs first. Mini-GBICs can be hot 
swapped—they can be installed or removed while the switch is powered 
on.
7.
(Optional) Connect a console to the switch (
).
 You may 
wish to modify the switch’s configuration, for example, to configure an IP 
address so it can be managed using a Web browser, from an SNMP 
network management station, or through a Telnet session. Configuration 
changes can be made by using the included console cable to connect a PC 
to the switch’s console port.
At this point, your switch is fully installed. See the rest of this chapter if you 
need more detailed information on any of these installation steps.