Panasonic cs-c12dku User Manual

Page of 77
(Lack of refrigerant in the refrigeration cycle)
Procedure:
 1. Confirm that both the 2-way and 3-way valves are set to
the open position.
 2. Connect the charge set to the 3-way valve’s service
port.
 • 
Leave the valve on the charge set closed.
 • 
Connect the charge hose with the push-pin to the
service port.
 3. Connect the charge set’s centre hose to refrigerant
reclaiming equipment.
 • 
Purge the air from charge hose.
 4. Open the valve (Low side) on the charge set and
discharge the refrigerant until the gauge indicates 7.25
PSI (0.5 kg/cm
2
G) to 14.5 PSI (1 kg/cm
2
G).
 • 
If there is no air in the refrigeration cycle (the pressure
when the air conditioner is not running is higher than 0.1
PSI (1 kg/cm
2
G), discharge the refrigerant until the
gauge indicates 7.25 PSI (0.5 km/cm
2
G) to 14.5 PSI (1
kg/cm
2
G). If this is the case, it will not be necessary to
apply a evacuation.
 • 
Discharge the refrigerant gradually; if it is discharged
too suddenly, the refrigeration oil will also be
discharged.
 5. Turn on refrigerant reclaiming equipment.
11.4. Balance refrigerant of the 2-way, 3-way valves
49
CS-C9DKU CU-C9DKU / CS-C12DKU CU-C12DKU