Panasonic cs-c12dku User Manual

Page of 77
11.5. Evacuation
(No refrigerant in the refrigeration cycle)
Procedure:
 1. Connect the vacuum pump to the charge set’s centre
hose.
 2. Evacuation for approximately one hour.
 • 
Confirm that the gauge needle has moved toward -14.5
PSI (-76 cmHg) [vacuum of 4 mmHg or less.]
 3. Close the valve (Low side) on the charge set, turn off
the vacuum pump, and confirm that the gauge needle
does not move (approximately 5 minutes after turning
off the vacuum pump).
 4. Disconnect the charge hose from the vacuum pump.
 • 
Vacuum pump oil
If the vacuum pump oil becomes dirty or depleted,
replenish as needed.
50
CS-C9DKU CU-C9DKU / CS-C12DKU CU-C12DKU