Polycom spectralink jpi300 User Manual

Page of 68
SpectraLink 6300 MCU: Facility Preparation 
PN: 1725-36122-001_M.doc 
20 
Required Materials Provided by Customer 
Required hardware 
†
  Rack
  The shelves are designed to fit into a 19” mounting rack. 
Each shelf measures 15” high x 19” wide x 9” deep, and weighs 
approximately 35 pounds fully loaded.  
†
  Backboard Space
  As an alternative to rack mounting, the shelves 
can be wall mounted to 3/4” plywood securely screwed to a wall. 
†
  Screws 
 Required to mount the shelves to the wall, or to secure it 
in the rack. For wall mount, six #10 5/8” panhead wood screws 
(or similar device) are required. For rack mount, screws required 
are determined by the rack requirements; typically 10-32 or 1/4-
20. For multi-shelf systems, four 1.75” #8 panhead wood screws 
are required to secure the Intershelf Junction Panel to the 
backboard, along with standoffs at least 1.5” long with 1/4” inside 
diameter. 
†
  Power and Conduit
  -48V Power Source and conduit for connection, 
either 1/2” BX metallic or NMX conduit. Three #8 insulated rings 
for use with #14 AWG wire are required for each MCS300 to be 
installed. 
†
  25-Pair Cables
  RJ-21 male at MCU end, required to connect the 
shelves to the cross-connect blocks. 
†
  Cross-Connect Blocks
  Required to connect the PBX ports and the 
Base Stations to the MCU. 
†
  Quick Clip Fuse
  Required with an RCO400 Outdoor Base Station 
or when a Base Station is located in a separate building from the 
SpectraLink 6300 MCU. Recommended Quick Clip Fuse is 
available from Reliable Electric, Model # RSCP-2. 
†
  Ladder 
 Polycom installation crew will require a ladder to reach 
the Base Station locations. Ensure that a ladder of adequate height 
is available for the crew’s exclusive use upon arrival.