Site Preparation 
The following steps must be completed before installing the system 
hardware. If the steps are not already completed refer to each 
individual section for details. 
†
 
MCU location prepared. Typically the MCU is installed in the 
telephone equipment room. This location must have sufficient 
backboard space or rack space, and -48 volt power available. 
†
 
The correct number of cross-connect blocks (or equivalent) are 
installed and connected to a 25-pair Telco wire terminated with an 
RJ-21 male connector at the MCU location. The number of blocks 
required depends on the number and type of Interface Modules 
installed. Refer to Chapter 4, section Prepare Demarc Blocks for 
more information. 
†
 
A two-pair cable to each Base Station as designated on the 
building floor plans. 
†
 
The Base Station wiring is terminated with RJ-45 crimp-on plugs 
at the designated Base Station locations. Refer to Chapter 4, 
section Terminate Cables at Base Station Locations for more 
information. 
†
 
The Base Station wire is terminated at the appropriate cross-
connect demarc blocks. Refer to Chapter 4, section Connect Cables 
from Base Stations and Phone Lines to Demarc Blocks
†
 
The analog or digital phone extensions from the phone system are 
terminated at the appropriate cross-connect demarc block and the 
block is labeled. Refer to Chapter 4, section Connect Cables from 
Base Stations and Phone Lines to Demarc Blocks
†
 
A dedicated dial line is available with an RJ-11 jack for the 
diagnostic modem. 
†
 
An IBM-compatible PC is available to serve as the Operator’s 
Console for system administration. 
†
 
A system administrator is designated for the SpectraLink system. 
This person should be present for the installation. The Polycom 
field service engineer will provide system training to the system 
administrator on the day following the installation. 