GE LTC MAP User Manual

Page of 68
 
Section 3: Installation 
3-7 
70055MP Revision D 
February 3, 2000 
Wiring 
Overview 
Prior to starting any wiring procedures: 
Pull the power fuse (F1) on the Power Supply board. 
• 
Securely ground the LTC-MAP 2130 at the ground lug. 
CAUTION: Pull the power board fuses or remove F1 on the I/O board before 
making connections. 
WARNING: The LTC-MAP 2130 Monitor must be properly grounded before 
placing the unit in service. An improper or missing ground can create a 
safety hazard. 
Refer to Figure 3-4 for fuse and ground lug locations.   
LTC-MAP 2130 wiring consists of: 
• 
Wiring the sensors. 
• 
Wiring a tap position indicator (if used). 
• 
Wiring the AC current  inputs. 
• 
Wiring the AC voltage inputs. 
• 
Wiring the digital inputs. 
• 
Wiring the annunciator outputs. 
• 
Wiring the internal heater. 
• 
Wiring power. 
Refer to Figure 3-4 for I/O Board Terminal Locations.   Refer to Figure 3-5 for 
an example of a typical wiring diagram.