GE sg series 10 User Manual

Page of 88
 
GE
 
OPM_SGS_USM_10K_40K_0US_V010.doc 
82/88 Operating 
Manual 
SG Series 10, 20, 30 & 40 kVA 
8.1.7  EPO (Emergency Power Off) Input contact 
4
1
3
2
3
2
1
SGT5
000_1
00-15
0_Customer inter
fa
ce
 EPO
_0
1
4
XB
J2
JP3
 
Fig. 8.1.7-1   Terminals for connection EPO 
An external Emergency switch (Normally 
Closed voltage-free contact) can be connected 
on terminals XB / 1 - 4 or connector J2 / 12 - 
25
 
of the P4 - Interface Customer
 
 
 
Remove the cable short-circuiting terminals 
XB 2 - 3) 
when using this external switch. 
 
 
To enable this function, remove cable short-circuiting XB / 2 - 3 on the 
Terminal XB and the Jumper JP3 on P4 – Customer Interface
, when the 
cables have been already connected on XB or J2
 
 
In a parallel system a separate NC (Normally Closed) contact must be 
connected individually to each unit.
 
 
When opened, this contact causes the immediate opening of the Contactors K3K4K6K7 
and K8
, as well as the shutdown of RectifierInverter and Static-Switch
 
 
Be aware: The reliability of the system depends on this contact! 
 
After closure of the Emergency contact, a reset is necessary to enable the restart of 
the UPS, by pressing the key “O”
 (inverter off) on the control panel. 
 
 
In case of a parallel system press the key “O” (inverter off) on the 
control panel of each unit connected on parallel bus and having it’s 
output switch Q1 closed.