Crestron mmk-15l wmkm-15l User Manual

Page of 12
Crestron MMK-15L & WMKM-15L 
 
Mud Mount Kits
 
Installation 
This section provides an installation procedure for each Mud Mount Kit. The 
procedure for the MMK-15L starts below and the “WMKM-15L Procedure” starts 
on page 5. 
MMK-15L Procedure 
The procedure in this section provides the necessary steps for the assembly of the 
MMK-15L to either the PMK-15L or BB-15L. It is assumed that the PMK-15L or 
BB-15L has been secured to the stud according to the procedures in the latest 
revisions of their respective Installation Guides (Doc. 6363 and Doc. 6362, 
respectively). Also, it is assumed that drywall is in place and a rectangular cutout for 
the touchpanel is made in the drywall (refer to the Drywall Cutout dimensions on 
page 2 for cutout dimensions). 
Complete the steps in the order provided. The only tools or materials required and 
not supplied are a drywall saw or equivalent, four standard drywall screws, #2 
Phillips screwdriver, a level, and tools/material to apply drywall joint compound. 
CAUTION: Allow an air gap of at least 12 inches in the wall cavity above the 
touchpanel for heat dissipation. 
NOTE:  The illustrations in this procedure show the installation of the MMK-15L 
with the PMK-15L. Even though the illustrations only show the PMK-15L, they are 
identical for the BB-15L as well. 
1.  Pass a fastener plate through the opening and align its two center holes 
with the top two pins on the PMK-15L. Verify that the pins on the 
fastener plate are not between the fastener plate and the PMK-15L. 
Refer to the illustration after this step for visual guidance. 
Secure Fastener Plates to PMK-15L (or BB-15L) 
(2) FASTENER PLATE
(2004825)
PMK-15L
(2004121)
(4) PUSH-ON FASTENER
 
2.  Slide a push-on fastener over each pin of the PMK-15L (or  
BB-15L) to loosely secure the fastener plate and the mounting plate. 
Installation Guide – DOC. 6364 
Mud Mount Kits:  MMK-15L & WMKM-15L  
  3