Panasonic CZ256ESMC2 Operating Guide

Page of 102
30
6 Using the System
6.3.6 Clear accumulation data
Use this screen to erase total data after test runs, and to restart total calculations for operating 
time, operating counts, and so on.
Procedure
Select  5.Initial settings  in the main menu and  5.Clear accum. data  in the sub menu, then 
proceed as follows.
@
1.Status/Control
2.Total data/Cut-off
3.Distrib. ratio/Usage
4.Maintenance/Test Run
5.Initial settings
6.Auxiliary settings
1.Date/Distrib.
2.CNTR/Unit/Ten. No.
3.Ten. name/Distrib. Gr.
4.Pulse meter setting
5.Clear accum. data
1
  Touch  Clear accum. data .
A window like the following appears.
Touch  Yes . Total data up to now is erased, and 
calculation of total operating time restarts.
Main
Sub
5
5
5
5
CZ-256ESMC2_EN.indb   30
CZ-256ESMC2_EN.indb   30
3/31/2011   2:03:07 PM
3/31/2011   2:03:07 PM