Cisco CATALYST 6509E 9 SLOT 15U CHASSIS NO POWER SUPPLY NO FAN TRAY Specification Guide

Page of 336
4-43
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 4      Removal and Replacement Procedures
  Removing and Installing the DC-Input Power Supplies
Figure 4-33 DC-Input Wire Connections for 2700 W Operation (Right-Side Power Bay)
Step 11
Position and secure the left and right inner terminal block covers. 
Step 12
Using the cable tie provided, place the cable tie through the slot at the top of the right terminal block 
cover, and secure the wiring to the left terminal block.
Step 13
Secure outer terminal block cover.
Caution
To prevent a short circuit or shock hazard after wiring the DC-input power supply, reinstall the terminal 
block covers.
Step 14
After you confirm that all installation steps are completed correctly, remove any safety flags, lockout 
devices, or adhesive tape from the source DC circuit breakers, and energize the input circuits to the 
power supplies. 
Step 15
Turn the power switch to the On (|) position on the power supply. Turning on the power switch also 
engages a pawl that locks the power supply in the chassis.
Step 16
Verify the power supply operation by ensuring that the power supply front panel LEDs are in the 
following states:
INPUT OK LED is green
FAN OK LED is green
OUTPUT FAIL LED is not lit
If the LEDs indicate a power problem, see the 
114011
3
INPUT OK
FAN
OK
OUTPUT
FAIL
I
0
1
2
Captive 
installation
screw
Power
switch
Plastic
insulator
(   ) Ground
Power leads
attached to
terminal block
(+)  Positive
( - ) Negative
(+)  Positive
( - ) Negative
Terminal
block cover