Cisco CATALYST 6509E 9 SLOT 15U CHASSIS NO POWER SUPPLY NO FAN TRAY Specification Guide

Page of 336
4-50
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 4      Removal and Replacement Procedures
  Removing and Installing the DC-Input Power Supplies
Figure 4-39 DC-Input Wire Connections for 4000 W Operation (Right-Side Power Bay)
Step 12
Using the cable tie provided, place the cable tie through the slot at the top of the right terminal block 
cover, and secure the wiring going to the left terminal block.
Step 13
Position and secure the left and right inner terminal block covers. 
Step 14
Secure the outer block cover.
Note
For proper 4000 W DC-input redundant power configuration, all three pairs of input wires for 
one 4000 W DC-input power supply must come from the same battery system (A feed), and all 
three pairs of input wires for the other 4000 W DC-input power supply must come from another 
battery system (B feed).
Warning
When installing or replacing the unit, the ground connection must always be made first and 
disconnected last. 
Statement 1046
Caution
To prevent a short circuit or shock hazard after wiring the DC-input power supply, reinstall the terminal 
block covers.
Step 15
After you confirm that all installation steps are completed correctly, remove any safety flags, lockout 
devices, or adhesive tape from the source DC circuit breakers, and energize the input circuits to the 
power supplies. 
114009
3
INPUT OK
FAN
OK
OUTPUT
FAIL
I
0
1
2
Terminal
block cover
Captive 
installation
screw
Power
switch
Plastic
insulator
Power leads
attached to
terminal block
(+)  Positive
( - ) Negative
(+)  Positive
( - ) Negative
Plastic
insulator
(   ) Ground
Terminal
block cover
(   ) Ground
Power leads
attached to
terminal block
(+)   Positive
( - )  Negative