Cisco CATALYST 2950G ENHANCED IMAGE 24 PORT 10/100 SWITCH WITH 2 GBIC SLOTS Specification Guide

Page of 6
 
 
 
 
All contents are Copyright © 1992–2006 Cisco Systems, Inc. All rights reserved. Important Notices and Privacy Statement. 
Page 1 of 1 
 
 
 
Product Bulletin No. EOL1094 
End-of-Sale and End-of-Life Announcement for Select 
Cisco
 
Catalyst
 
2950G and Catalyst 2950T Series Switches 
Cisco Systems
®
 announces the end-of-sale and end-of-life dates for the Cisco
®
 Catalyst
®
 2950G and Catalyst 2950T Series 
Switches. The last day to order the affected products is December 31, 2006. Customers with active service contracts will 
continue to receive support from the Cisco Technical Assistance Center (TAC) until December 30, 2011.
Table 1 lists the product numbers covered by this announcement. 
Please note that several products in the Cisco Catalyst 2950 Series are not affected by this announcement.  
Table 1. 
Product Part Numbers Affected by This Announcement  
End-of-Sale Product Part Number
 
Product Description
 
Cisco Catalyst 2950 Series Switch
 
WS-C2950G-48-EI
 
48 10/100 + 2 1000BASE-X + Enhanced Image
 
WS-C2950G-24-EI
 
24 10/100 + 2 1000BASE-X + Enhanced Image
 
WS-C2950G-12-EI
 
12 10/100 + 2 1000BASE-X + Enhanced Image
 
WS-C2950T-24
 
24 10/100 + 2 10/100/1000 BASE-T + Enhanced Image
 
WS-C2950T-48-SI
 
48 10/100 + 2 10/100/1000 BASE-T + Standard Image
 
 
Table 2 describes the end-of-life milestones, definitions, and dates for the affected Cisco Catalyst 2950 Series switches.  
Table 2. 
End-of-Life Milestones and Dates for Select Cisco Catalyst 2950 Series Switches 
Milestone
 
Definition
 
Date
 
End-of-Life Announcement Date
 
The date the document that announces the end of sale and end of life of a 
product is distributed to the general public.
 
April 17, 2006
 
End-of-Sale Date
 
The last date to order the product through Cisco point-of-sale mechanisms. The 
product is no longer for sale after this date.
 
December 31, 2006
 
Last Shipment Date
 
The last-possible ship date that can be requested of Cisco and/or its contract 
manufacturers. Actual ship date is dependent on lead time.
 
April 1, 2007
 
End of Software Maintenance 
Releases Date
 
The last date that Cisco Engineering may release any final software maintenance 
releases or bug fixes. After this date, Cisco Engineering will no longer develop, 
repair, maintain, or test the product software.
 
December 31, 2007
 
End of Routine Failure Analysis Date
 
The last-possible date a routine failure analysis may be performed to determine 
the cause of product failure or defect.
 
December 31, 2007
 
End of New Service Attachment Date
 
For equipment and software that is not covered by a service-and-support 
contract, this is the last date to order a new service-and-support contract or add 
the equipment and/or software to an existing service-and-support contract.
 
December 31, 2007