Cisco CATALYST 2950G ENHANCED IMAGE 24 PORT 10/100 SWITCH WITH 2 GBIC SLOTS 仕様ガイド
All contents are Copyright © 1992–2006 Cisco Systems, Inc. All rights reserved. Important Notices and Privacy Statement.
Page 1 of 1
Product Bulletin No. EOL1094
End-of-Sale and End-of-Life Announcement for Select
Cisco
Cisco
Catalyst
2950G and Catalyst 2950T Series Switches
Cisco Systems
®
announces the end-of-sale and end-of-life dates for the Cisco
®
Catalyst
®
2950G and Catalyst 2950T Series
Switches. The last day to order the affected products is December 31, 2006. Customers with active service contracts will
continue to receive support from the Cisco Technical Assistance Center (TAC) until December 30, 2011.
Table 1 lists the product numbers covered by this announcement.
Please note that several products in the Cisco Catalyst 2950 Series are not affected by this announcement.
Table 1.
Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
Cisco Catalyst 2950 Series Switch
WS-C2950G-48-EI
48 10/100 + 2 1000BASE-X + Enhanced Image
WS-C2950G-24-EI
24 10/100 + 2 1000BASE-X + Enhanced Image
WS-C2950G-12-EI
12 10/100 + 2 1000BASE-X + Enhanced Image
WS-C2950T-24
24 10/100 + 2 10/100/1000 BASE-T + Enhanced Image
WS-C2950T-48-SI
48 10/100 + 2 10/100/1000 BASE-T + Standard Image
Table 2 describes the end-of-life milestones, definitions, and dates for the affected Cisco Catalyst 2950 Series switches.
Table 2.
End-of-Life Milestones and Dates for Select Cisco Catalyst 2950 Series Switches
Milestone
Definition
Date
End-of-Life Announcement Date
The date the document that announces the end of sale and end of life of a
product is distributed to the general public.
April 17, 2006
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The
product is no longer for sale after this date.
December 31, 2006
Last Shipment Date
The last-possible ship date that can be requested of Cisco and/or its contract
manufacturers. Actual ship date is dependent on lead time.
April 1, 2007
End of Software Maintenance
Releases Date
The last date that Cisco Engineering may release any final software maintenance
releases or bug fixes. After this date, Cisco Engineering will no longer develop,
repair, maintain, or test the product software.
December 31, 2007
End of Routine Failure Analysis Date
The last-possible date a routine failure analysis may be performed to determine
the cause of product failure or defect.
December 31, 2007
End of New Service Attachment Date
For equipment and software that is not covered by a service-and-support
contract, this is the last date to order a new service-and-support contract or add
the equipment and/or software to an existing service-and-support contract.
December 31, 2007