Landis+Gyr Technology Inc. EG6R3S2 User Manual
`çããÉêÅá~ä=~åÇ=fåÇìëíêá~ä=jÉíÉê=jçÇìäÉ=fåëí~ää~íáçå
SJNO
`ÉääåÉí=d~ë=jçÇìäÉ=~åÇ=jÉíÉê=fåëí~ää~íáçå=dìáÇÉ
12 Install new tamper seals over two screws using the plastic sleeve provided
(optional).
Figure 6.20 Rockwell/Equimeter/Sensus: center test dial, counter installed, or index
13 Utilize the RF Buster to verify module is transmitting, hold RF Buster with
magnet side to the top upper left quadrant of the module plastic and hold the
button until 10 beeps are received. See
button until 10 beeps are received. See
Appendix C
, Using the RF Buster for
more information.
14 Clean up any debris from the retrofit and installation processes and tie any
loose cables with tie wraps.
15 Proceed to the next installation site.
16 At the end of the day, return to the Cross Dock for the check‐in process. Turn
16 At the end of the day, return to the Cross Dock for the check‐in process. Turn
in inventory of unused, defective, or broken gas Meter Modules. Check in all
handheld computers issued. You must reconcile any discrepancies in the
changeout data before the check‐in process can be completed. Meter Modules
will not be checked out to an installer who has not completed the previous
dayʹs check‐in process.
handheld computers issued. You must reconcile any discrepancies in the
changeout data before the check‐in process can be completed. Meter Modules
will not be checked out to an installer who has not completed the previous
dayʹs check‐in process.
Sprague/Actaris Meter Module Installation
Figure 6.21 Sprague/Actaris: Indexes before installation