12 Install new tamper seals over two screws using the plastic sleeve provided 
(optional). 
Figure 6.20 Rockwell/Equimeter/Sensus: center test dial, counter installed, or index
13 Utilize the RF Buster to verify module is transmitting, hold RF Buster with 
magnet side to the top upper left quadrant of the module plastic and hold the 
button until 10 beeps are received. See 
Appendix C
, Using the RF Buster for 
more information. 
14 Clean up any debris from the retrofit and installation processes and tie any 
loose cables with tie wraps. 
15 Proceed to the next installation site. 
16 At the end of the day, return to the Cross Dock for the check‐in process. Turn 
in inventory of unused, defective, or broken gas Meter Modules. Check in all 
handheld computers issued. You must reconcile any discrepancies in the 
changeout data before the check‐in process can be completed. Meter Modules 
will not be checked out to an installer who has not completed the previous 
dayʹs check‐in process.
Sprague/Actaris Meter Module Installation
Figure 6.21 Sprague/Actaris: Indexes before installation