Landis+Gyr Technology Inc. ER6R1S4 User Manual

Page of 77
Draft
Chapter 4 - Deploying Endpoints
Landis+Gyr
30
98-1723 Rev AB
User Guide
 Figure 4 - 9. Endpoint/Meter Selection
5. Fill in the Removed Meter Information data fields.
6. Enter the Final Reading (optional).
7. Enter the Final Reading Date (optional).
8. Enter the Removed Endpoint Information data. Select a reason for the removal from the drop-
down list box.
9. Awaiting Re-deployment status will appear. This option will transition the endpoint to 
Inventory status.
10. Permanently Remove From Service. This option will archive the endpoint. An endpoint in 
Archived status will not be included in any Command Center reports.
Click Save to activate the changes that were just made. A message indicating the success or failure 
of the removal will be displayed.
Monitoring Deployment
Cellular Meter deployment may be monitored via the Deployment Status Report or the Installa-
tion Report
.
Deployment Status Report
The Deployment Status Report can be used to track the progress of Cellular meter deployments for 
a selected period of time. It provides a graphical overview of the deployment process for deploy-
ments not exceeding seven days, by default. The default number of deployment days aggregated can 
be configured in Organization Information settings. Some of the data required for the Deployment 
Status Report is provided via the Import Installation file.
Following is the procedure for generating the Deployment Status report:
1. Click Network > Deployment Status. The Deployment Status window will open.
2. Selection Criteria. Select the Collector radio button and select the desired collector from the 
drop-down box to view statistics for a specific collector. Select All Collectors to see all 
collectors/endpoint in the system.
3. Date Range. Enter a Start Date and End Date. Click the Calendar icon to view and use the 
calendar for date selection.
4. Click OK. The Deployment Status Report will open, as shown in Figure 4 - 10.