RadioFrame Networks Inc DH2 User Manual
RadioFrame System
Equipment Commissioning
RFN_3.1 Beta
93
Conduct an onsite walk through to verify that the following Site Development
Punch List items have been properly installed. This inspection ensures that the
site installation meets quality standards.
Punch List items have been properly installed. This inspection ensures that the
site installation meets quality standards.
•
Grounding
- buss bar OK (optional)
- NCU/ACU rack(s)
- rectifier rack
- battery shelf (GNB)
- buss bar OK (optional)
- NCU/ACU rack(s)
- rectifier rack
- battery shelf (GNB)
•
Peco II Rectifier Voltages (measured voltages)
- float voltage
- equalize voltage
- high voltage
- low voltage
- low voltage pickup
- low voltage drop out
- float voltage
- equalize voltage
- high voltage
- low voltage
- low voltage pickup
- low voltage drop out
•
Battery Information (for batteries 1 through 8)
- Plant voltage
- Measured voltage
- connections corroded
- terminals greased
- signs of leakage
- Plant voltage
- Measured voltage
- connections corroded
- terminals greased
- signs of leakage
•
Main Rack
- EAS revision complete
- CSU grounded
- 5 MHz ‘A’ split with ‘T’
- 5 MHz ‘B’ split with ‘T’
- EAS revision complete
- CSU grounded
- 5 MHz ‘A’ split with ‘T’
- 5 MHz ‘B’ split with ‘T’
•
T1 Information, Primary and Secondary
- T1 circuit ID#
- T1 surge arrestor installed/grounded
- T1 repeater shelf / cfl cabinet location
- T1 level at extended demarc (RJ48 x jack)
- T1 circuit ID#
- T1 surge arrestor installed/grounded
- T1 repeater shelf / cfl cabinet location
- T1 level at extended demarc (RJ48 x jack)
•
Summary
- log book at site with recent entry
- outstanding issues/punch list items for site
- defective equipment found/replaced
- log book at site with recent entry
- outstanding issues/punch list items for site
- defective equipment found/replaced
5.5.2
Site As-Built Acceptance Test Procedures
Complete the test procedures described in this section to record the site as built.