Method of Procedure 
Equipment Commissioning 
96 
RFN_3.1 Beta
 
• 
Channel (RAPs only) 
• 
Port connections between RFS components 
5.5.3.2 Cabling 
Pathways 
A schematic showing the route of each cable run at the site. For each cable run, 
list the following: 
• 
Cable length 
• 
Cable type 
• 
Connector types (both ends) 
• 
Cable labeling completed per specs 
• 
Port Connections 
• 
Continuity test results 
• 
Distance test results 
5.5.3.3 
Floor Plan/Site Drawing 
Use a floor plan or site drawing to denote the location of the following on each 
floor of the building: 
• 
Main rack 
• 
Remote ACUs, including power source 
• 
RFUs 
• 
URUs, including power source 
5.5.4 
RadioFrame System Acceptance Test 
During installation, each component of the RFS is verified for power and 
connectivity. Assuming that each system component—NCU, ACU, RFU, and 
URU—has been properly installed and is receiving power, double check that all 
Power, Status, Link and Activity LEDs throughout the system are lit and are 
green. For any other condition on any system component or connection, refer to 
section 7.3 Corrective Maintenance, subsection 7.3.3 RadioFrame System for 
troubleshooting procedures. 
5.6  RadioFrame System Functionality Test 
This section describes the procedures that are used to test and verify the 
RadioFrame Networks equipment. This certification process ensures proper 
operational performance and verifies the integrity of the following services: