RadioFrame Networks Inc DH2 User Manual

Page of 164
RadioFrame System 
Operations and Maintenance 
RFN_3.1 Beta
  
115 
Operations and Maintenance 
A report of the RFS iDEN/802.11 site should be maintained and left on site. The 
report should include iDEN Interface, Power Plant, and RFS. This report will 
provide metrics for possible concerns with individual components and /or the 
entire system.  
It is important that the technician performing the checks understand the 
equipment theory and operation. Review the documentation (references) prior to 
verification and performing service. 
This chapter contains procedures for the following: 
• 
Upgrading System Software 
• 
Preventive maintenance 
• 
Corrective maintenance 
• 
Field replaceable units (FRUs) 
• 
Alarm resolution procedures, 
• 
Repair and technical support 
7.1  Upgrading System Software 
The RadioFrame System is shipped with the latest software and hardware 
installed. With each new software release, RFN provides its customers with the 
new software (this software can also be downloaded from the RFN FTP site) and 
upgrade instructions for that release in the Customer Release Notes RFN_X.X 
(P/N 991-xxxx-00). The instructions describe how to upgrade to the latest 
software from any prior version.  
To upgrade hardware, refer to section 7.4 Field Replaceable Units—RadioFrame 
System. 
7.2 Preventive 
Maintenance 
7.2.1 iSC-3 
Refer to the Gen 3 Site Controller System Manual, Motorola, 68P80801E30-O for 
preventive maintenance information. 
7.2.2 Power 
Plant 
A report of the Total Plant Condition should be maintained and left on site. The 
report should include rectifier, controller operation and condition of batteries. This