RadioFrame Networks Inc DH2 User Manual

Page of 164
Method of Procedure 
Appendixes 
148  
RFN_3.1 Beta 
 
 
Figure 36 
Mount the NCU only in an EIA-standard compliant 19” rack. 
Mount the ACU in the Main Rack 
The ACU is mounted in the main rack supplied with –48VDC power.  
1  Find these items in the ACU shipping container: one ACU and four mounting 
screws. 
2  Mount the ACU only in an EIA-standard compliant (19”) rack using all 4 
screws provided. For safe operation, follow these guidelines: 
• 
Do not mount the ACU in any orientation other than that specified in the 
following illustration. 
• 
Mount the ACU so that both the front and the back are accessible. 
• 
If the mounting holes do not line up, adjust the ACU up or down until the 
mounting holes line up. 
 
 
Caution 
Do not block the air vents on the sides or rear of the ACU. 
 
3  Plug the ACU into main rack power source (rectifier or PDU). 
4  Verify that the ACU is receiving power and that each NCU card is operational. 
Each card installed in the front and back of the ACU has two LEDs: Power 
and Status. All LEDs should light green.