RadioFrame Networks Inc DH2 User Manual

Page of 164
RadioFrame System 
Appendixes 
RFN_3.1 Beta  
149 
 
Figure 37 
Mount the ACU only in an EIA-standard compliant 19” rack. 
Connect the NCU to the ACUs 
After the main rack has been installed and all wiring for the RFS has been 
completed, connect the main rack ACU and all remote ACUs to the NCU.  
1  Connect the RJ45-to-RJ45 CAT 5 cable for each ACU to the specified RJ45 
port (1-8) on the back of the NCU. 
Refer to the site documentation to determine which ACU connects to each 
port on the NCU. The Activity and Link LEDs above the ports will remain unlit 
until each ACU has been installed and plugged in.  
 
Figure 38 
Connect the RJ45-to-RJ45 CAT 5 cable for each ACU to the specified 
RJ45 port on the back of the NCU.