RadioFrame Networks Inc MCSERIES10 User Manual

Page of 152
MC-Series System Installation & Testing 
Installation 
RadioFrame Networks, Inc.
  
41 
 
Figure 26 
Top of the rack (TOR) cabling and equipment 
4.6.1 Grounding 
Ground the cabinet ground bar to the site according to Nextel’s installation instructions using 
6 and 8 gauge lugs (part number/family name TBD). 
Connect the site ground to the ground at the top of the rack according to Nextel’s installation 
procedures (see the previous diagram for ground location at the top of the rack). 
4.6.2 T1 
Follow Nextel’s procedure for routing the site T1 cable through the top of the cabinet as 
shown in the previous diagram. 
Connect the T1 cable to the CSU according to Nextel’s installation instructions. 
 
Tx 
Rx 
Diversity 
ventilation 
GPS 
DC PWR 
T1 
EAS alarm 
cabling 
GND