RadioFrame Networks Inc MCSERIES10 Manuale Utente
MC-Series System Installation & Testing
Installation
RadioFrame Networks, Inc.
41
Figure 26
Top of the rack (TOR) cabling and equipment
4.6.1 Grounding
1
Ground the cabinet ground bar to the site according to Nextel’s installation instructions using
6 and 8 gauge lugs (part number/family name TBD).
6 and 8 gauge lugs (part number/family name TBD).
2
Connect the site ground to the ground at the top of the rack according to Nextel’s installation
procedures (see the previous diagram for ground location at the top of the rack).
procedures (see the previous diagram for ground location at the top of the rack).
4.6.2 T1
1
Follow Nextel’s procedure for routing the site T1 cable through the top of the cabinet as
shown in the previous diagram.
shown in the previous diagram.
2
Connect the T1 cable to the CSU according to Nextel’s installation instructions.
Tx
Rx
Diversity
ventilation
GPS
DC PWR
T1
EAS alarm
cabling
cabling
GND