MC-Series System Installation & Testing 
Final Checkout and Commissioning 
RadioFrame Networks, Inc.
  
45 
Ensure that the following RadioFrame Networks software is available: 
•  CD ROM (backup)  
•  New versions can also be downloaded from RFN web site to the local root directory (C:/) 
 
For local software downloads, have the following available on the laptop: 
•  FTP server software—WFTPD32 is shareware that can be downloaded from the following 
site:  http://www.wftpd.com/ 
•  Terminal emulation software (e.g., PROCOM) 
5.2 Checkout 
Procedures 
 
 
Warning! 
Verify that all breakers in the PDU are in the OFF position prior to proceeding. 
Leave them in the OFF position until instructed otherwise. 
 
Verify that all breakers in the PDU are in the OFF position prior to proceeding. Leave them in 
the OFF position until instructed otherwise. 
Conduct a visual inspection of the cabling on the rear of the cabinet verifying that all 
connections are in place, tight, and complete. 
Add and remove RadioBlades according to the site configuration. Refer to section 7.7.1 
Replacing an iDEN 2-Port RadioBlade Transceiver. 
Verify that cabling matches the site configuration. 
Refer to Appendix C “Cabling Diagrams: 3-Sector Configuration”. For any other configuration, 
refer to section 8.2 Adding a Sector and section 8.3 Removing a sector. 
Install 50 ohm 2W terminators on all used Tx / Rx / Diversity ports on the top of the cabinet. 
Verify that there is DC power at the supply terminals on the PDU and that the polarity is 
correct. Refer to 2.5 Specifications for more information. 
5.3  Initial Powering Procedure 
Verify that all breakers in the PDU are in the OFF position. 
Ensure that the power switches on the iSCs and the EAS are all in the OFF position. 
Using the breakers on the PDU, turn up the equipment by completing the following steps, and 
verifying that each component is operational before proceeding to the next step. 
Using the breaker on the PDU and the power switch on the front of the primary iSC-3, turn up 
the primary iSC-3, and then verify that it is operational and that GPS lock has been 
established before proceeding. For more information, refer to the Motorola document Gen 3 
Site Controller System Manual, 68P80801E30-O