RadioFrame Networks Inc MCSERIESHP10 User Manual

Page of 131
Installation  
MC-Series High-Power System 
  
998--01 
Rev 
X1 
46 
CONFIDENTIAL AND PROPRIETARY 
RadioFrame Networks, Inc. 
 
TRADE SECRET INFORMATION 
Figure 27  Connections between the Primary iSC and BIC 
 
4.3.2  EAS 
Note:  Typically, the EAS is installed by RadioFrame Networks before the MC-Series 
High-Power system is shipped. If you need to install an EAS, follow this procedure:  
1  While supporting the EAS, slide the EAS into the cabinet mounting position. 
2  Mount the EAS in the location shown in Figure 26. 
3  Secure the EAS to the cabinet mounting rails using the four mounting screws 
provided with the unit. Tighten the screws to 4.5 Nm (40 in-lb). 
4  Connect the RFN-provided ground cable (P/N 820-0609-10; EAS to GND BAR) 
between the cabinet ground bar and the grounding lug on the rear of the EAS, and 
ensure the connection is tight. 
5  Connect the RFN-provided power cable (P/N 820-0616-50; EAS to PDU-EAS) 
between the EAS power and the EAS circuit breaker on the PDU.  
6  Connect EAS to each iSC-3 according to Sprint Nextel’s installation procedure. 
7  Refer to Figure 28. Connect the RFN-provided contact closure alarm wires from the 
CONTROL port on the EAS (RJ-45) to the STATUS connectors on the PDU 
(Molex). 
Figure 28  Connection between EAS Control Port and PDU Status Connectors